Here is a simple outline of the NUDURA I.C.F. build process.
For examples of finished NUDURA homes in Ireland, please visit our Gallery
Stage 1
Foundations are prepared as normal, and rising walls are constructed with NUDURA.
Stage 2
Floor insulation and all services are installed as in a standard build.
Stage 3

NUDURA’s wall system is quick and easy to erect.
The lightweight formwork simply clicks into place – like oversized Lego!
Walls must be properly supported with braces before concrete is poured.
Stage 4

Concrete is poured into the NUDURA formwork structure.
Concrete is vibrated into place to ensure consolidation.
The insulating formwork stays in place when the concrete sets – to provide a complete envelope of insulation around the structure, both inside and out.
Stage 5
The NUDURA build system is compatible with any type of floor system.
Timber, metal, or precast concrete floors can be used.
Stage 6
Roof structure is put onto the NUDURA I.C.F. structure as in a standard build.
Stage 7
Roof is completed and windows are installed ready for external finishing.
Stage 8
Once the building is sealed, NUDURA ceiling insulation is fitted to create a complete energy-efficient insulation envelope.
Stage 9

The completed NUDURA build offers exceptional energy-efficiency and comfort.
A wide range of external finishes can be used, including stone, brick or timber cladding, and acrylic render (as used in this example).